We are able to combine and leverage our diverse capabilities, successfully delivering fully integrated structural,
mechanical and electrical construction, installation, maintenance, E&I and shutdown projects.
Pilgangoora Lithium Processing Plant
See project
Dugald River Zinc & Lead Processing Plant
See project
FAM Stacker/Reclaimer
See project
MSP Kwinana - Rotating Equipment
See project
North Star IBO – E&I Construction
See project
North Yard Substation Port Hedland
See project
Mt Piper Power Station - AVR Installation
See project
Mt Piper Power Station - PLC Upgrade
See project
Subiaco Wastewater Treatment Plant
See project
Barbalin 5ML Reinforced Concrete Tank
See project
Wastewater Overflow Risk Management
See project
E&I: Control Systems
See project

Resources

Pilgangoora Lithium Processing Plant

Category:
Lithium Processing Facility
Project:
Pilgangoora Lithium Processing Plant
Location:
Pilbara, WA
Client:
Pilbara Minerals

EPC of a processing plant for the Pilgangoora Lithium-Tantalum Mine in WA.

Scope included the EPC of a 2Mtpa Lithium-Tantalum Processing Plant, including wet and dry circuit with concentrator, associated plant and commissioning at Pilbara Mineral’s Pilgangoora Lithium-Tantalum Mine located 120km south of Port Hedland.

Dugald River Zinc & Lead Processing Plant

Category:
Zinc/Lead
Project:
Dugald River
Location:
Cloncurry, QLD
Client:
MMG Limited

A contract with MMG Limited to deliver the construction of a zinc & lead processing plant at MMG’s Dugald River project near Cloncurry in QLD.

Scope of work included project management, fabrication and supply of various structural steel, mechanical and E&I components, construction (SMP and E&I) and commissioning support for a zinc and lead concentrator and associated plant.

FAM Stacker/Reclaimer

Category:
Materials Handling Facility
Project:
Installation of Stacker/Reclaimer
Location:
Abbot Point QLD
Client:
FAM Magdeburg

Mechanical & Electrical erection of a Stacker-Reclaimer at the Adani Coal Port in Qld.

Scope included the supply of all labour, equipment and services for the mechanical and electrical site erection, testing, inspection.

MSP Kwinana - Rotating Equipment

Category:
Lithium Refinery
Project:
Rotating Equipment
Location:
Kwinana, WA
Client:
MSP

Fabrication and installation of Rotating Equipment for the MSP Tianqi Lithium Refinery in WA.

Scope included Installation & Fabrication of a 20Ktpa Lithium Hydroxide Monohydrate Processing Plant, including rotating equipment, associated plant and commissioning.

Power

North Star IBO – E&I Construction

Category:
IBO North Star
Project:
North Star Iron Bridge Operations
Location:
Pilbara WA
Client:
FMG

The electrical and instrumentation scope of works for the North Star project comprised temporary, early and permanent construction works.

Key activities performed in relation to these works included fabrication, transportation, erection, installation, testing and pre-commissioning. We performed site installation of switchrooms, transformers and vendor equipment including any necessary remedial works.

North Yard Substation Port Hedland

Category:
Mining Substation
Project:
North Yard Substation
Location:
Nelson Point, WA
Client:
BHP Iron Ore

Installation, construction, test & commissioning of new North Yard substation switch room, HV transformers, NER and infrastructure to provide BHP with a new a switchyard facility.

The project ensured minimal plant shutdowns and seamless operation during the decommissioning and dismantling of BHP’s Nelson point Secondary Crushing building.

Mt Piper Power Station - AVR Installation

Category:
AVR Installation Works
Project:
Mt Piper Power Station
Location:
Mt Piper, NSW
Client:
Alstom Pty Ltd

Removal of existing AVR for the Turbine Generating unit and installation & wiring of a new AVR.

The project involved removal of the existing hardware and cubicle, installation of additional control cabling and equipment and installation of the new AVR.

Mt Piper Power Station - PLC Upgrade

Category:
PLC Upgrade
Project:
Water Treatment Plant PLC Upgrade
Location:
Mt Piper, NSW
Client:
Siemens

Removal of existing PLC and wiring, including wiring to temporary stands to allow plant to be run overnight on the old PLC hardware.

Installation of new PLC to replace the existing. Scope also included permanent wiring transfer to the new system once the software was proven to function correctly; followed by testing & commissioning .

Water

Subiaco Wastewater Treatment Plant

Category:
Wastewater Treatment Plant
Project:
67 MLD Upgrade Works
Location:
Perth, WA
Client:
WA Water Corporation

Subiaco WWTP is one of the largest in Western Australia, handling an average daily dry-weather flow of 63 Mega Litres.

Scope included a new inlet works and primary settling tank distribution chamber; upgrading the capacity and improving efficiency of the existing plant; installation of modulating valves and flow meters for improved distribution; and electrical installation, including an upgrade to the plant SCADA system.

Barbalin 5ML Reinforced Concrete Tank

Category:
5ML Reinforced Concrete Tank
Project:
5ML Reinforced Concrete Circular (RCC) Tank
Location:
Barbalin Reservoir, WA
Client:
WA Water Corporation

The project encompassed construction, installation, testing and commissioning. Scope included earthworks for tank pad and foundation; construction and installation of a new 5ML reinforced concrete ground tank; and inlet, outlet, overflow and connections to existing water supply network.

We also completed mechanical, electrical, instrumentation, SCADA and security works for the tank site, and general civils including drainage, access roads, fencing and concrete works.

Wastewater Overflow Risk Management

Category:
SCADA
Project:
Wastewater Overflow Risk Management (WORM) Stage 1
Location:
Perth Metro, WA
Client:
WA Water Corporation

Scope included upgrading 84 Wastewater Pump Stations (WWPS) sites of varying ages and conditions, to a consistent Client SCADA standard. A full turn-key solution from electrical, communications and control systems design to retrofitting of hardware to existing switchboards, software development and implementation of the design – including construction, factory testing and on-site installation of new panels as as upgrade to the SCADA system Remote Terminal Unitwell (RTU) and ClearSCADA programming, configuration and integration.

E&I: Control Systems

Category:
Control Systems
Project:
67MLD Upgrade Works
Location:
Perth, WA
Client:
WA Water Corporation

Contracted to deliver design, construction, integration, testing and commissioning of the 67 Mega Litres per Day (MLD) upgrade to the Subiaco Wastewater Treatment Plant (WWTP).

Scope included engineering, programming, configuration and overall integration and testing of the control system, field equipment and instrumentation of the new inlet works and secondary sediment area into the existing plant control and SCADA system; allowing seamless migration from the incumbent Citect SCADA system to the ClearSCADA system.